FD
Flexible data-center loads
Topic
What experts have said about Flexible data-center loads
1 statement · 1 positive
One percent annual flexibility could unlock roughly 100 gigawatts of grid capacity.
“if you can be flexible, 100 hours out of the year, four days out of the year, 1% downtime, that unlocks 100 gigawatts of capacity on the grid”
Open the episode · 200GW Hiding in Grid, Sodium Batteries 10x Cheaper, Wave-Powered Datacenters w/ Ramez Naam | EP #280Listen at 32:28
Statements are attributed to the speaker as said on the episode and reflect their view at the time, not PodLume's. They are not advice.